• Sinosteel Corporation, Head Office, Beijing, China

  • Iron Ore

    Chrome Ore

  • 1.2 mtpa Pellet Plant for MSPL, India

  • 1.5 mtpa Recovery Coke Oven for JSW Steel, India

  • Steel Making & CCM Workshop for Tosyali, Turkey

    1.2 mtpa Bar/Wire Rod Mill for ICDAS Steel Plant, Turkey

 

MD Desk

Mr. Zhang Jiuzhou
(Managing Director)
Office Tel: 0091 11 42895600,
Fax: 0091 1142895628

Waste Heat Power Generation of Sontering

Low temperature fume waste heat power generation for 6*99 2 of Mining Company of Shougang Iron & Steel Corporation

Customer:Shougang Iron&Steel Corporation

Project Schedule:2009-2010

Contract content: The 6×99 m2 + 360 m2 sintering machine is modified from the rotary cooler, and the waste heat boiler is built to the steam turbine power generation system and water treatment and other relevant auxiliary facility, adopting EPC general contracting mode.

The scope of the project is divided into 7 sections:

  • 6 sets of 98 m2 small sintering machine extraction type cooler waste heat boiler.3
  • 360 m2 sintering machine forced air rotary cooler waste heat boiler .
  • Steam turbine shop.
  • Circulating water shop.
  • Demineralized water shop .
  • External pipe network
  • 110 kV step down substation modification and relevant switch station modification of mining company .

The capacity of the waste heat power generation facility is (6×10 t/h +51.4 t/h) boiler +25 MW steam turbine power generator unit . The building of the steam turbine shop is built on the land of the existing boiler house after dismantling, and it will be completed by the end of April, and currently it is under construction.

Typical Projects

2010-10-08
2010-09-26

2010-09-26

Related News

2013-10-30
2011-08-31
2011-05-01