• Sinosteel Corporation, Head Office, Beijing, China

  • Iron Ore

    Chrome Ore

  • 1.2 mtpa Pellet Plant for MSPL, India

  • 1.5 mtpa Recovery Coke Oven for JSW Steel, India

  • Steel Making & CCM Workshop for Tosyali, Turkey

    1.2 mtpa Bar/Wire Rod Mill for ICDAS Steel Plant, Turkey

 

MD Desk

Mr. Zhang Jiuzhou
(Managing Director)
Office Tel: 0091 11 42895600,
Fax: 0091 1142895628

Steel Making & Continuous Casting

1# KR Hot Metal Desulphurization, Desilicatation and Dephosphorization Project for Xingcheng Spcial Steel Co., Ltd.

Customer:Jiangyin Xingcheng Special Steel Co., Ltd.

Period of Project: Dec. 2004-Sep. 2005

Scope of Contract: Desulphurizing, Desilicatating and Dephosphorizing Station for Hot Metal

Type of Contract: EPC

Main Technical Characteristics:

Rated capacity of molten iron tank is 100t, and max. treatment capacity is 125t. Annual molten iron treatment capacity of two sets of device is more than 2,350,000t. After desulphurization, sulphur content of molten iron ≤0.010% (sulphur content of molten iron ≤0.005% for deep desulphurization process), and temperature ≥1250℃. After desilicatating and dephosphorizing processes, composition of molten iron reaches following requirement: P≤0.025%;Si≤0.25%,temperature≥1250℃

Highlights of Project:

* transforming and improvement of advanced foreign technology

* high efficiency of desulphurization

* short desulphurization period

* reasonable process arrangement

* easy operation

* automatic temperature measurement and sampling

* high efficient de-slagging technology

* material charging metallurgical model which makes charging of desulphurizing material more reasonable and reduces slag quantity and protects temperature from lowering.

Typical Projects

2010-10-08
2010-10-08
2010-10-08

Related News

2012-10-15
2010-09-03
2010-01-28