Steel Making & Continuous Casting
1# KR Hot Metal Desulphurization, Desilicatation and Dephosphorization Project for Xingcheng Spcial Steel Co., Ltd.
Customer:Jiangyin Xingcheng Special Steel Co., Ltd.
Period of Project: Dec. 2004-Sep. 2005
Scope of Contract: Desulphurizing, Desilicatating and Dephosphorizing Station for Hot Metal
Type of Contract: EPC
Main Technical Characteristics:
Rated capacity of molten iron tank is 100t, and max. treatment capacity is 125t. Annual molten iron treatment capacity of two sets of device is more than 2,350,000t. After desulphurization, sulphur content of molten iron ≤0.010% (sulphur content of molten iron ≤0.005% for deep desulphurization process), and temperature ≥1250℃. After desilicatating and dephosphorizing processes, composition of molten iron reaches following requirement: P≤0.025%;Si≤0.25%,temperature≥1250℃
Highlights of Project:
* transforming and improvement of advanced foreign technology
* high efficiency of desulphurization
* short desulphurization period
* reasonable process arrangement
* easy operation
* automatic temperature measurement and sampling
* high efficient de-slagging technology
* material charging metallurgical model which makes charging of desulphurizing material more reasonable and reduces slag quantity and protects temperature from lowering.
Typical Projects |
|
2010-10-08 |
|
Related News |
|
2012-10-15 |