• Sinosteel Corporation, Head Office, Beijing, China

  • Iron Ore

    Chrome Ore

  • 1.2 mtpa Pellet Plant for MSPL, India

  • 1.5 mtpa Recovery Coke Oven for JSW Steel, India

  • Steel Making & CCM Workshop for Tosyali, Turkey

    1.2 mtpa Bar/Wire Rod Mill for ICDAS Steel Plant, Turkey

 

MD Desk

Mr. Zhang Jiuzhou
(Managing Director)
Office Tel: 0091 11 42895600,
Fax: 0091 1142895628

Production News

Successful billet withdrawing of 2# CCM for the environmental protection relocation project of Chongqing Steel undertaken by SINOSTEEl Equipment and Engineering Co., Ltd.

2010-09-03

Following the successful billet withdrawing of 3# CCM for the environmental protection relocation project of Chongqing Steel undertaken by SINOSTEEl Equipment and Engineering Co., Ltd., the company continuously strive for the project to overcome the difficulties as many construction companies, serious mutual influence and difficult coordination, and with delicate organization and strict management, successful billet withdrawing of 2# CCM is realized at 14:38 on August 30, 2010, which is again to the satisfaction of the owner.

Currently the project department of the company for the environmental protection relocation project of Chongqing Steel are organizing engineering technical and project management personnel to strive to cooperate with the owner for the production target and for the assistance for the final acceptance test.