• Sinosteel Corporation, Head Office, Beijing, China

  • Iron Ore

    Chrome Ore

  • 1.2 mtpa Pellet Plant for MSPL, India

  • 1.5 mtpa Recovery Coke Oven for JSW Steel, India

  • Steel Making & CCM Workshop for Tosyali, Turkey

    1.2 mtpa Bar/Wire Rod Mill for ICDAS Steel Plant, Turkey

 

MD Desk

Mr. Zhang Jiuzhou
(Managing Director)
Office Tel: 0091 11 42895600,
Fax: 0091 1142895628

Production News

Sinosteel MECC contracting EPC of Hebei Iron & steel group company coal gas fired power generation project completed and put into production

Recently, Sinosteel MECC contracting EPC of Hebei Iron & steel group company coal gas fired power generation project completed and put into production, General manager Lu Pengcheng attended the completion ceremony and gave a speech.

This project is an important energy-saving emission reduction project for Chenggang, inSeptember, 2011 sinosteel MECC signed the EPC contract, which including the construction of a 260t/h high temperature and high pressure gas boiler, a set of 60MW extraction condensing turbine and power booster station, circulating water system, the system of chemical water treatment, gas station, the medium energy pipelines and other facilities. Since Jan,2012 officially starting of the project, the company actively overcome narrow construction site, external piping and electrical construction tramp over mountains and through ravines, covers an area along the lane and other adverse effects, in just 10 months time to achieve the completion of the project put into production, saving the requirements of the contract period of 2 months in advance.

The project completed and put into production, the bearing steel gas zero emission targets, at the same time, a substantial increase in the proportion of bearing steel independent power, marked in the practice of energy-saving emission reduction, promote the development of circular economy, promoting the drop of the efficiency on the road has taken a solid step forward steel bearing. Bearing steel leadership ability and level of project construction steel equipment good to give full recognition. The project completed and put into production, to lay a more solid foundation for the company to further develop the domestic market surplus gas power generation project.