• Sinosteel Corporation, Head Office, Beijing, China

  • Iron Ore

    Chrome Ore

  • 1.2 mtpa Pellet Plant for MSPL, India

  • 1.5 mtpa Recovery Coke Oven for JSW Steel, India

  • Steel Making & CCM Workshop for Tosyali, Turkey

    1.2 mtpa Bar/Wire Rod Mill for ICDAS Steel Plant, Turkey

 

MD Desk

Mr. Zhang Jiuzhou
(Managing Director)
Office Tel: 0091 11 42895600,
Fax: 0091 1142895628

Production News

No.1 2350m? BF of Cangzhou Zongheng Iron & Steel Complex Contracted by Sinosteel MECC Successfully Achieved Target Production

2009-03-23

On March.18, 2009, the utilization coefficient of No.1 2350m3 BF reached 2.34 t/d•m3, i.e. daily production of 5500 tons, exceeding the target BF coefficient of 2.3 t/d•m3 in the EPC contract and designed evaluating performance index of 5405 tons Fe daily output.

Since The No.1 2350m3 BF was put into production on Sept.16, 2009, technicians and engineers form Sinosteel MECC have making fully effort on this project, ensuring the successful target production achievement, which displays the engineering and managing capacity on EPC projects of Sinosteel MECC, and further solid the brand image of Sinosteel Group in both domestic and oversea market.