Blast Furnace Top Gas Recovery Turbine Unit
General Contrac Ting for Energy saving project of Rongxin Iron and Steel Co.,ltd of Tangshan
Customer:Rongxin Iron and Steel Co.,ltd of Tangshan
Project Schedule:2009-2010
Contract Type: EPC
Contract content:3×130 t/h boiler + 2×25 MW fuel gas fired power generation + 80000 m3 COG holder +100000 m3 BFG holder +1080 m3 BF coal injection and TRT project.
The contract is signed in October 2009, and currently it is under construction. In order to fully utilize the excess gas produced during steel making and iron making production process, reduce emission of harmful gas, reduce costs, and realize sustainable development, the project utilizes the excess BFG about 257000 Nm3/h and COG about 17000 Nm3/h of the company to built comprehensive utilization project of gas.
This project belong the scope of energy saving and emission reducing project and it is in accordance with the national industrial policy. After completion of the project, the annual power generation is 4.27×108 kW•h, and the annual power supply is 4.01×108 kW•h. The hourly power generation capacity is 61000 kWh.
Typical Projects |
|
2010-10-08 |
|
Related News |
|
2013-10-30 |