2.4mtpa Pellet Project for Liuzhou Iron & Steel Corporation
Customer:Liuzhou Iron & Steel Corporation
Project duration:2003.09-2005.07
Design: including plant design and non-standard equipment design.
Equipment general contracting supply:
including all non-standard equipment and standard equipment package supply required for the project, package supply of electrical, instrument and computer equipment, software programming and site commissioning, equipment installation and commissioning instructions, assistance after successful on-load test run and other relevant site technical services.
Experienced, stable, practical and reliable process flow and equipment are adopted, and the technological equipment level is of domestic advanced level (to be subject to agreement between both parties.
Control level is required to be advanced, economical, practical, stable and reliable to ensure smooth production and required product quality.
Following national standards and codes regarding environmental protection, industrial health, safety and fire fighting and energy saving, attention paid to environmental protection, intensified waste control.
General layout is smooth, compact and reasonable to the most possible extent.
With the precondition ensuring main process, the process flow is optimized to the most possible extent, saving investment and reducing land occupation.