Coke Oven & By-product Project
1.5MT Stamping Coke Oven Battery with By-product Plant for JSW Steel Limited,India (EP)
Customer:JSW Steel Limited,India
Construction period: 2006-2008
Contract Type: EP
Contracting scope:
Design & engineering, equipment supply, supervision for civil work,erection,commissioning and heating-up, production operation guidance for one year.
Scale of project:
Four sets of 56 holes 4.3-meter tamping gas purification system was constructed,and annual production capacity was 1.5 mt per year.
Main technical characteristics:
Using the mature 4.3m tamping coking technology in China combining purified gas recovery and partial chemical product recovery.
Project highlights:
The project was the largest stamp coking project with the most complete systems undertaken by Chinese enterprises in overseas market by the time of contract signing and also the coking project of the shortest construction period in India.
Overview of JSW No.3 Coke Oven Battery | 50000m3Gas Holder |